Maps of Orbits and Crossover Locations per Data Take

IPF Baseline:
Phase:

This tool allows you to view maps of the 20Hz LRM and SARIN echo locations and the calculated crossover locations for each 30 and 45-day data take of Level-2 GDR-A.

These plots provide a low level check of the spatial distribution of the Level-2 echos and resulting crossover locations.

The first crossover data take starts from 18/10/2010, following the switch to SIRAL-A at the end of the commissioning phase.



Select Data Take Period:
30-days 60-days

Maps per 30-day Data Take
Data take Timespan Antarctica Greenland Global
14317/6/22 -> 16/7/22LRM / SARIN LRM / SARIN LRM
14218/5/22 -> 16/6/22LRM / SARIN LRM / SARIN LRM
14118/4/22 -> 17/5/22LRM / SARIN LRM / SARIN LRM
14019/3/22 -> 17/4/22LRM / SARIN LRM / SARIN LRM
13917/2/22 -> 18/3/22LRM / SARIN LRM / SARIN LRM
13818/1/22 -> 16/2/22LRM / SARIN LRM / SARIN LRM
13719/12/21 -> 17/1/22LRM / SARIN LRM / SARIN LRM
13619/11/21 -> 18/12/21LRM / SARIN LRM / SARIN LRM
13520/10/21 -> 18/11/21LRM / SARIN LRM / SARIN LRM
13420/9/21 -> 19/10/21LRM / SARIN LRM / SARIN LRM
13321/8/21 -> 19/9/21LRM / SARIN LRM / SARIN LRM